Planning 

Quality begins up front with a detailed plan.  Before a job is released to the shop the drawings are reviewed.  Design Engineers will confer with our manufacturing and quality personnel before any work is done.  The project is reviewed to make sure everyone has a clear understanding of task at hand. 

Contract CNC jobs are assigned a quality level prior to release.  The assigned level determines the extent of documentation for each job.  Higher quality levels may require a control plan, ballooned prints, and 100-percent dimensional layout.